Skip to content
You are using an unsupported browser. Please update your browser to the latest version on or before July 31, 2020.
You are viewing the article in preview mode. It is not live at the moment.
Pneumatics Enclosure (PE) Schematic and Pinouts

Pneumatics Enclosure (PE) Schematic and Pinouts

Use the attached PwnCNC Pneumatics Enclosure Functional Schematic (Rev. 1.0) to identify the air ports and electrical connectors on your PE, see how each connection works, and look up connector pin assignments.

Airflow and port layout

Compressed air enters on the right side of the enclosure. The internal valve routes air to the TOOL and DUST branch or to the Add’l outlet. TOOL supplies air for spindle tool release. DUST supplies the de-duster through a regulator set to 30 PSI. Page 1 shows the outlet panel as viewed from the outside and identifies the air and AC power inlets.

Electrical connections

Connector Pins Function
MTR 4 Supplies 24 VDC to the spindle sensors and carries their feedback into the PE.
Ctrl 5 Receives R1 and R2 valve commands from the CNC controller and passes S1 and S2 spindle sensor feedback back to it.
MTC 3 Connects the optional manual tool change button.
RUN 2 Connects to the VFD for the optional manual tool change setup.

Page 2 shows how power, commands, and sensor feedback move through the enclosure. Page 3 lists the pin assignments for all four connectors.

Before wiring third-party equipment

Follow the installation instructions for your enclosure revision and verify the pin numbers marked on the connectors. Confirm the R1/R2 input voltage and trigger polarity, the S1/S2 sensor output type, and the RUN contact behavior for your controller, spindle, and VFD.

Feedback
0 out of 0 found this helpful

Attachments

PwnCNC_PE_Schematic.pdf