Pneumatics Enclosure (PE) Schematic and Pinouts
Use the attached PwnCNC Pneumatics Enclosure Functional Schematic (Rev. 1.0) to identify the air ports and electrical connectors on your PE, see how each connection works, and look up connector pin assignments.
Airflow and port layout
Compressed air enters on the right side of the enclosure. The internal valve routes air to the TOOL and DUST branch or to the Add’l outlet. TOOL supplies air for spindle tool release. DUST supplies the de-duster through a regulator set to 30 PSI. Page 1 shows the outlet panel as viewed from the outside and identifies the air and AC power inlets.
Electrical connections
| Connector | Pins | Function |
|---|---|---|
| MTR | 4 | Supplies 24 VDC to the spindle sensors and carries their feedback into the PE. |
| Ctrl | 5 | Receives R1 and R2 valve commands from the CNC controller and passes S1 and S2 spindle sensor feedback back to it. |
| MTC | 3 | Connects the optional manual tool change button. |
| RUN | 2 | Connects to the VFD for the optional manual tool change setup. |
Page 2 shows how power, commands, and sensor feedback move through the enclosure. Page 3 lists the pin assignments for all four connectors.
Before wiring third-party equipment
Follow the installation instructions for your enclosure revision and verify the pin numbers marked on the connectors. Confirm the R1/R2 input voltage and trigger polarity, the S1/S2 sensor output type, and the RUN contact behavior for your controller, spindle, and VFD.

